Te Ara Pekapeka
2024
Typology: Bridge Design
Completion: 2024
Location: Hamilton
Lead Consultant: BBO
Lead Contractor: HEB Construction
Footbridge Contractor: PFS Engineering
Photographer: Simon Wilson
To us this bridge offered an opportunity to represent the people of Kirikiriroa and offer them an experience of joy and delight. Our group of local designers and artists and fabricators have worked together to create a functional and creative expression of a people who live by the river; both the people of our current time and the time before us.
The sculptural form of Te Ara Peka Peka’s support structure makes a subtle reference to the traditional Maori kete bag used for the transport of locally grown produce once traded along the river. It also makes a subtle reference to the weaving of cultures; both the historic coming together on the beach for trade, and the current cultural diversity that is enjoyed in Kirikiriroa. As the Taurapa footbridge arcs towards the river, the traveller is lifted above the hum of the traffic below, offering an elevated glimpse over the mighty Waikato.